TechNetBuddy

ACE PROFESSIONAL · DATA CENTER Lab 86

Arista: eBGP leaf-spine underlay

A small leaf-spine fabric: two spines in AS 65000 and two leaves in AS 65101 and 65102. The point-to-point links are addressed. Build the eBGP underlay so each leaf learns the other leaf’s host subnet through both spines.

Arista ACE Professional · Arista · 5 objectives
ACE PROFESSIONAL · CAMPUS Lab 87

Arista: LACP port-channel and VRRP gateway

Two Arista distribution switches are joined by two links and share the users’ gateway. Bundle the links into a LACP port-channel that trunks VLAN 10, give each switch an SVI, and run VRRP so 192.168.10.1 stays up if one switch fails. DIST1 must be master.

Arista ACE Professional · Arista · 5 objectives